When you want to bill a portion of a WIP transaction and carry over the remainder to bill at a later time, this is known as partial billing. When you bill a WIP transaction in the Detail Billing screen, the application assumes you want to final bill the item and write up or write down the difference between the WIP amount and the amount for which the item was billed. As a result, DT Practice automatically calculates the adjusting amount and enters it in the Adjusted column and leaves the carryover at zero. However, if you want to carry over the difference, you can replace the adjustment amount with zero, and DT Practice will then calculate the carryover amount, which is the portion of the WIP amount that was not billed.
Below are the methods for partially billing a single item, a selected set of WIP items, and all available items.