Stop tracking time for a project in Checkpoint
Edge

If you are working in Checkpoint
Edge
and your time should not be allocated to a project, you can stop your session data from being recorded.
  1. In the Time Tracking - Project List window or the Project List area of the Time Tracking screen, select
    Don't assign my time to a project
    .
  2. Select
    Continue
    .
  3. If you select
    Cancel
    , your settings will not be saved and you'll be logged out of Checkpoint
    Edge
    .