BOM Tab
The
BOM
tab allows you to define the specific raw materials required to produce each finished good you've listed in the Finished Goods
tab. It's recommended to complete the Raw Materials (RM)
and Finished Goods (FG)
tabs before proceeding to the BOM
tab.Fill in the BOM tab
Accessing the BOM Tab:
- With the information in theRaw MaterialsandFinished Goodstabs completed, go to theBOMtab within the ONESOURCE™ Global Trade platform.
Inputting BOM Information:
- In theBOMpop-up, select the appropriateFG Line Numfrom the dropdown menu. This action should auto-populate theFG Product Num, FGHS Num, andFG Product Namefields with the information from theFinished Goodstab.
Field | Information |
|---|---|
FG Line Num | Select the 'Line Num' from the 'FINISHED GOODS' tab using this drop-down box. This will display all existing 'Line Num' entries from the 'FINISHED GOODS' tab for you to choose from. |
BOM Version | Enter the version number of the BOM manually. This should reflect the current revision or iteration of the BOM you are working with. |
FG Line Num | It refers to the ‘Line Num’ in ‘FINISHED GOODS’ tab, the existing ‘Line Num’ from ‘FINISHED GOODS’ tab will be displayed in this ‘FG Line Num’ drop-down box. |
BOM Version | Enter the version number of the BOM manually. This should reflect the current revision or iteration of the BOM you are working with. |
Consumption Declare Status | Choose 1. 未申报 (not declared) from the drop-down options if this is the first registration for this BOM. This status is used to track the declaration process of the BOM. |
Consumption Declare Status | Select ‘1-未申报’ if it is the first time to register this BOM. |
Modify Mark Code | Select the appropriate code to indicate changes to the BOM:
|
BOM Start Date | Input the date when the BOM is initially put into use or the date from which the BOM is considered active. |
Fields that are mandatory will have an asterisk.
After you finish editing the tab, select
Save
to confirm the changes or Cancel
to go back to the BOM
tab.Add Raw Material (RM) consumptions details to a Bill of Materials (BOM)
This process involves entering the specific raw materials that will be used to manufacture the finished goods.
important
Ensure information in the Raw Materials (RM) and Finished Goods (FG) tabs is complete and validated.
- Within the BOM grid (parent level), find the finished good you want to add raw material consumption details for.
- Select the expand icon next to the chosen finished good record. This reveals sub-tabs or sections related to the selected finished good.
- Locate the sub-tab labeledRMDETAIL. This is where you'll enter RM consumption details.
- Select New within theRMDETAILsub-tab. This allows you to add a new line for each raw material used in the BOM for this FG.
- After entering details for a raw material, save the entry before proceeding to the next one.
- Follow steps 4 and 5 to add entries for all the raw materials required to produce the chosen finished good.
- Once you've entered raw material consumption details for all finished goods, select Save to confirm the entire BOM.
important
The
RM Line Num
dropdown might only become available after addressing any error messages displayed in the Validation Message
tab.