Extension settings error when modifying project due date

In Practice CS, if a project is added after the due date, the project defaults to a due date in the next year. If the project is then placed on extension, the following error may be generated:
Extensions must be setup so that each extension occurs after the previous extensions. Please adjust the extension settings.
In other words, the extended due date cannot be before the original due date.

Solution

The proper procedure for extending a project that has been added after the due date is as follows:
  1. Select
    Actions
    Manage Projects
    or
    Setup
    Clients
    and go to the Projects tab to open the client project.
  2. In the
    Due dates
    section, make sure the
    Extension
    field is set to
    Not extended
    .
  3. Use the
    Current
    field to enter a due date in the current year.
    note
    Remember, the date entered at this point needs to be earlier than the extended due date.
  4. Select
    OK
    to save the change.
  5. Open the project again.
  6. Use the
    Extension
    field to select the extension.
    note
    If there is no extension entry, right-click and choose
    Add Entry
    .
  7. Change the
    Current
    date to the extended due date.
  8. Select
    OK
    to save the project.