Set up completion and extension events on projects and tasks

You can use UltraTax CS status events to complete or extend Practice CS projects or tasks automatically.
  1. Set up Practice CS and UltraTax CS for integration and data sharing.
  2. In UltraTax CS, create a completion or extension event.
  3. In Practice CS, select
    Setup
    , then
    Firm
    .
  4. In the
    Preferences
    tab, select
    Integrate this firm with other solutions
    .

Add events to a current project or task

  1. Select
    Actions
    , then
    Manage Projects
    .
  2. Select either the
    Projects
    tab or the
    Tasks
    tab. The following steps reference projects, but if you select the
    Tasks
    tab, replace “Project” with “Task” in the steps.
  3. Create a filter:
    1. Filter by
      Project Template ID
      or
      Project Template Description
      .
    2. Set the method to
      is in the list
      Method
      .
    3. Select the ellipsis and select the projects you want to assign the event to.
    4. Select
      OK
      .
  4. Select the 1st project in the list to highlight it.
  5. Scroll to the bottom of the list of projects.
  6. Hold the
    Shift
    key and select the last project in the list. All the projects should now be selected.
  7. Right-click the selected projects and select
    Edit Selected Projects
    .
  8. Select
    Change project information
    and select
    Next
    .
  9. Select
    solution
    as the field you'd like to update and select
    UltraTax CS
    as the solution.
  10. Select the event you want to assign to the project. You can't assign an extension event to a task because tasks can't be extended.
  11. If the event you want to assign is not listed, populate a list of UltraTax CS completion events.
  12. Select
    Finish
    .
  13. Select
    Yes
    .

Add to a project or task template

If you want the event to be assigned to future generations of the project or task, add it to a template.
  1. Select
    Setup
    ,
    Templates
    , then
    Projects
    .
  2. Select the project template you want to change and select
    Edit
    .
  3. To change a project template, select the
    Main
    tab.
  4. To change a task template, select
    Tasks
    , then double-click on the task you want to change.
  5. Select the
    Select Solution
    dropdown and select
    UltraTax CS
    .
  6. Use the
    Completion event
    or
    Extension event
    dropdown to assign an event. You can't assign an extension event to a task because tasks can't be extended.
  7. If the event you want to assign is not listed, populate a list of UltraTax CS completion events.

error-icon

Triva isn't available right now.

Check out the support page for our phone number and hours

error-close